A49 Link Road Wigan - Page 9 Empty A49 Link Road Wigan

on Tue Sep 27 2016, 11:26
First topic message reminder :

The Goose Green to Westwood Park Link Road, is due to start construction soon and I know that Tomplum is really looking forward to work on the new road starting and mac said in another topic that they have been pegging out for the road bridge over the stream, so this is a plan of the new road, which has been made by a company called Tekla Smile

Sniffy Brook Bridge
A49 Link Road Wigan - Page 9 A49_link_road_-_smithy_brook_bridge_02-sq

Entire Road
A49 Link Road Wigan - Page 9 A49_link_road1

https://www.tekla.com/uk/bim-awards/a49-link-road


Cadfael
Cadfael
Posts : 1688
Join date : 2014-06-20

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Oct 10 2018, 07:49
@Sir Bob wrote:Well they have finally broken wind on the new road, they have made another compound opposite St Clements Court and yesterday a container was delivered there I presume for Cadfael to have a kip in and that appeared with diggers and dumper trucks and the digger broke wind at the side of the Tippings this morning and at the other end it has been swarming with Jones Bros pick ups on the old railway line along with little diggers which have been scraping all the crap off the old railway line Smile

Not my cabin, mine is at Westwood Way... but I did walk over to Poolstock Compound last night to help the guard there to repair fencing.
Sir Bob
Sir Bob
Posts : 7269
Join date : 2013-12-07

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Oct 10 2018, 15:41
@Cadfael wrote:
@Sir Bob wrote:Well they have finally broken wind on the new road, they have made another compound opposite St Clements Court and yesterday a container was delivered there I presume for Cadfael to have a kip in and that appeared with diggers and dumper trucks and the digger broke wind at the side of the Tippings this morning and at the other end it has been swarming with Jones Bros pick ups on the old railway line along with little diggers which have been scraping all the crap off the old railway line Smile

Not my cabin, mine is at Westwood Way... but I did walk over to Poolstock Compound last night to help the guard there to repair fencing.

Well it looks like they are proceeding along with the same plan as drawn up about three years back, which is it starts with construction of the main compounds and then satellite compounds and the first job on the new road is to scrape off the top soil and vegetation and any other crap and they have now fenced off the roundabout access to it on Warrington Road at Goose Green

Sir Bob
Sir Bob
Posts : 7269
Join date : 2013-12-07

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 12:47
I was talking to a man last Friday who works on Plant Hire, he drives diggers and such like and he goes from job to job around the Northwest, in that one week he might be digging up someone's back garden and next he might be working on a new road, such as the Westwood Link Road and he was telling me that firms like Jones Bros, who are building the road, use a combination of their own equipment and employees to do the building and when they come to a part of the project, which needs extra equipment and man power, they then hire those extra resources as they are needed, sub contracting the work, which is where he comes into the picture ....

He said that he was hoping to get some local work from the new link road construction, because he lives literally within spitting distance of the new road in Poolstock and his firm which I won't say which it is, but he told me (I luv secrets jocolor ) they do work for Jones Bros, so I says to him "hee they are really getting on with it now aren't they" to which he said with amusement "No they have not even started on it yet" to which I thought of Tom and said "Oooh" he carried on "they are still taking off the top soils and replacing them with hardcore" What a Face

So that must mean they have to remove all of the old railway line embankment and then dig down and remove all of the railway embankment foundations (if there are any) and then dig a bit more and put down hardcore, so yoo must be talking about thousands and thousands of tons of shit being removed and no doubt being processes as hazardous type material rabbit
oaplum
oaplum
Posts : 8480
Join date : 2013-12-05
Age : 66
Location : notreetsville
http://www.tomplum.co.uk

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 13:13
I've just had a butchers through the fence on the path of St Pauls Church and the new houses, The only work being done is the canal bridge footings, It seems to me the canal bridge will be the first signs of life to the new road, The muck they move is sold, each wagon load is moved on Price, Think of it this way, If you wanted a ton of muck for your garden, it would cost you £50 at the very least, A wagon will hold 50 tons, nothing is thrown away,
Sir Bob
Sir Bob
Posts : 7269
Join date : 2013-12-07

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 13:24
Yes but that muck looks like nasty stuff, the old railway embankment was made from the spoil of a local pit and I used to know the name of the pit and it looks very black stuff, as though there is a lot of coal in it, so surely that might mean that it is 'contaminated' cat
oaplum
oaplum
Posts : 8480
Join date : 2013-12-05
Age : 66
Location : notreetsville
http://www.tomplum.co.uk

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 14:26
contaminated only means the stuff you want is mixed with stuff you don't want, It will be separated and sold to differant markets, Every thing as a worth, thats why they go to great depths to mine it,Wink
Cadfael
Cadfael
Posts : 1688
Join date : 2014-06-20

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 14:35
I think it was Moss Pit Sir Bob.


They have started to work on the canal bridge on the Scotsmans Flash side of the canal, I am told in is going to be a reinforced earth bridge... with the earth being held back with plastic!

The Westwood side has had test drilling done this last week, which is now done and bridge work should begin early January.
Sir Bob
Sir Bob
Posts : 7269
Join date : 2013-12-07

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 14:39
A49 Link Road Wigan - Page 9 709307421
oaplum
oaplum
Posts : 8480
Join date : 2013-12-05
Age : 66
Location : notreetsville
http://www.tomplum.co.uk

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 17:10
reinforced earth Bridge, I've never heard of that before, Sounds very interesting and I'll be keeping an eye out with my camera as it transpires,
A49 Link Road Wigan - Page 9 Bmam7210
broady
broady
Posts : 1413
Join date : 2014-01-24
Age : 69
Location : Calgary, Alberta, Canada

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 17:21
They must be very big trucks to carry 50 tons. They are the type normally used on open cast mining. Certainly not allowed on highways.
oaplum
oaplum
Posts : 8480
Join date : 2013-12-05
Age : 66
Location : notreetsville
http://www.tomplum.co.uk

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 17:35
ok 50 tons to the compound then 32 tons off the site in eight leggers, Rolling Eyes
avatar
thaknows
Posts : 12
Join date : 2017-09-02

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 17:48
32 tonne MGW eight legger can only carry carry 20 tonnes payload
broady
broady
Posts : 1413
Join date : 2014-01-24
Age : 69
Location : Calgary, Alberta, Canada

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 18:34
Sure you are correct Tom but it must be a nice long run and great ground conditions to get those beasts rumbling along.
tonker
tonker
Posts : 6293
Join date : 2013-12-05
Location : Metropolitan Borough of Haydock

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 19:07
@broady wrote:They must be very big trucks to carry 50 tons. 

A 'very big' dumper truck can carry over 300 tonnes !
broady
broady
Posts : 1413
Join date : 2014-01-24
Age : 69
Location : Calgary, Alberta, Canada

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 19:43
As ever Tonker you are correct. We have lots over here working in the oil sands. However I doubt you will see them in Worsley Mesnes. I think the biggest I saw on road construction in the UK was a Cat 767 and the conditions had to be ideal. I think Macs had them in the M55 where they worked for months hauling away peat at the Blackpool end of the job. Mind you that was in 1974 so I could have the numbers mixed up.
tonker
tonker
Posts : 6293
Join date : 2013-12-05
Location : Metropolitan Borough of Haydock

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Wed Dec 26 2018, 20:15
@broady wrote: .... I think Macs had them in the M55 where they worked for months hauling away peat at the Blackpool end of the job.

Mac can't even drive a BMW proper, never mind a Cat 767!    Laughing
Admin
Admin
Admin
Posts : 46512
Join date : 2013-12-04

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Sat Dec 29 2018, 18:35
Lol Very Happy
Mac
Mac
Posts : 51186
Join date : 2013-12-06
Location : Here!

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Sat Dec 29 2018, 19:07
There's true.

_________________
Wigan Rejects. Everything Wiganworld wants to be.
Sir Bob
Sir Bob
Posts : 7269
Join date : 2013-12-07

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Sun Dec 30 2018, 12:18
@oaplum wrote:I've just had a butchers through the fence on the path of St Pauls Church and the new houses, The only work being done is the canal bridge footings, It seems to me the canal bridge will be the first signs of  life to the new road, The muck they move is sold, each wagon load is moved on Price, Think of it this way, If you wanted a ton of muck for your garden, it would cost you £50 at the very least, A wagon will hold 50 tons, nothing is thrown away,

They probably want to get the canal bridge done first, for construction to coincide with the winter shutdown of the canal for winter maintenance, so that by the spring when all the boaters are back, the roadworks are not in the way of the canal users Smile
oaplum
oaplum
Posts : 8480
Join date : 2013-12-05
Age : 66
Location : notreetsville
http://www.tomplum.co.uk

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Sun Dec 30 2018, 12:24
Good thinking Sir Bob, that comes under the heading of 'forward planning' a gift that is not often associated with Wigan Council nor building contractors, I think is was probably that the canal bridge was the first structure to be fabricated and will be the first to be delivered, Very Happy
Cadfael
Cadfael
Posts : 1688
Join date : 2014-06-20

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Sun Dec 30 2018, 13:50
@broady wrote:They must be very big trucks to carry 50 tons. They are the type normally used on open cast mining. Certainly not allowed on highways.

This is the largest truck on the site, and it was delivered during the night on a low loader with a wide load escort.

A49 Link Road Wigan - Page 9 45802848324_13e69c00e1_b
Cadfael
Cadfael
Posts : 1688
Join date : 2014-06-20

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Sun Dec 30 2018, 13:56
@oaplum wrote:you're not clued up to modern security procedures Sir Bob, Caddie has to do a patrol every  so often, there will be a pre planned route which alternates, along the route will be eletronic sensors that log Caddies activities, if he does not picked up by the sensors, ' M' sends out 008 to find out why, if he's asleep in the hut, he is TERMINATED, Very Happy

I do have what is called a Diestar unit, and I have to register it at certain points on the site.  I do not have a set patrol route, but I must be registered as visiting all the sensor points on a given patrol. It also has GPS and will register any long periods of inactivity.
broady
broady
Posts : 1413
Join date : 2014-01-24
Age : 69
Location : Calgary, Alberta, Canada

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Sun Dec 30 2018, 15:57
Cadfael,
Thanks for the photo. Only a baby dump truck that one. I suspectif there is an incident someone can do a print out showing your route around site as you carried out your duties.
tonker
tonker
Posts : 6293
Join date : 2013-12-05
Location : Metropolitan Borough of Haydock

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Sun Dec 30 2018, 16:22
@broady wrote:They must be very big trucks to carry 50 tons.

@broady wrote:Cadfael,
                Thanks for the photo. Only a baby dump truck that one.

If a 'very big' dumptruck carries 50 tons, surely one that can carry 35 tons can't be regarded as 'a baby'?  Laughing
Vixen
Vixen
Posts : 5987
Join date : 2013-12-05

A49 Link Road Wigan - Page 9 Empty Re: A49 Link Road Wigan

on Sun Dec 30 2018, 16:28
it's a "Tonker" truck......