on Wed Sep 06, 2017 9:04 am
Motorists could face delays as major repair work on a Wigan bridge is expected to start in the coming weeks. Structural work had been planned to start in July for the 71-year-old Adam Bridge, on Southgate at the Saddle junction. But that was pushed back and will instead start later this month or early in October, though the actual date has not yet been confirmed. A sign erected on Southgate to warn drivers of the upcoming roadworks has been amended with the new dates. scratch

Read more at: http://www.wigantoday.net/news/environment/delayed-bridge-work-is-due-to-start-in-weeks-1-8738489
avatar
tonker
Posts : 5221
Join date : 2013-12-05
Location : Metropolitan Borough of Haydock

Re: Adam Bridge work

on Wed Sep 06, 2017 11:29 am
That's NOT Adam Bridge.

THIS IS Adam Bridge!

(zoom in to read the name on the wall)
avatar
Admin
Admin
Posts : 43369
Join date : 2013-12-04

Re: Adam Bridge work

on Wed Sep 06, 2017 11:36 am
avatar
Sir Bob
Posts : 6530
Join date : 2013-12-07

Re: Adam Bridge work

on Wed Sep 06, 2017 11:51 am
I think the council are going to be working on the bridge over the river dooglas, half of that bridge is about 33 years old and the half on the Asda side is a lot older than that.
avatar
Cadfael
Posts : 1462
Join date : 2014-06-20

Re: Adam Bridge work

on Wed Sep 06, 2017 12:22 pm
They did not do such a good job in 2008 if it needs more work now.
avatar
Sir Bob
Posts : 6530
Join date : 2013-12-07

Re: Adam Bridge work

on Wed Sep 06, 2017 2:29 pm
If the work was being done on the railway line, the line would have to be closed and Network Rail would be announcing that, but they haven't because they isn't.
avatar
Admin
Admin
Posts : 43369
Join date : 2013-12-04

Re: Adam Bridge work

on Mon Dec 11, 2017 2:48 pm
Major traffic hold-ups have seen traffic grind to a halt around Wigan's busiest junction today. But council highway bosses say snarl-ups around The Saddle should ease with the end of repairs to Adam Bridge. Today should see the final part of the junction being resurfaced - with engineering work due to be completed by 3.30pm.

Read more at: https://www.wigantoday.net/news/transport/adam-bridge-delays-finally-set-to-end-1-8904152
avatar
Corky Ringspot
Posts : 52538
Join date : 2013-12-04
Location : Up a nick in Russia

Re: Adam Bridge work

on Mon Dec 11, 2017 6:05 pm
Hurrah.

The gateway to Pem. Wigan's answer to the Rive Gauche.
avatar
oaplum
Posts : 7566
Join date : 2013-12-05
Age : 65
Location : notreetsville
http://www.tomplum.co.uk

Re: Adam Bridge work

on Tue Dec 12, 2017 4:12 pm
The work on Adam bridge is still going on today at 11am when I went through,  Work is ongoing on the way out of Wigan and there are still cones diverting traffic away from the left hand side near Screwfix/halfords side,
avatar
Vixen
Posts : 5801
Join date : 2013-12-05

Re: Adam Bridge work

on Tue Dec 12, 2017 4:49 pm
still there at 4.15pm
avatar
Sir Bob
Posts : 6530
Join date : 2013-12-07

Re: Adam Bridge work

on Tue Dec 12, 2017 5:24 pm
I went through there about 3.00pm and it looks like the works are coming to an end and I would say they will end this week, but not today and then they have to remove all of their equipment and sweep up after themselves Smile