The Goose Green to Westwood Park Link Road, is due to start construction soon and I know that Tomplum is really looking forward to work on the new road starting and mac said in another topic that they have been pegging out for the road bridge over the stream, so this is a plan of the new road, which has been made by a company called Tekla
Sniffy Brook Bridge

Entire Road

https://www.tekla.com/uk/bim-awards/a49-link-road
The Goose Green to Westwood Park Link Road, is due to start construction soon and I know that Tomplum is really looking forward to work on the new road starting and mac said in another topic that they have been pegging out for the road bridge over the stream, so this is a plan of the new road, which has been made by a company called Tekla

Sniffy Brook Bridge

Entire Road

https://www.tekla.com/uk/bim-awards/a49-link-road
- Sir Bob
- Posts : 8595
Join date : 2013-12-07
Re: A49 Link Road Wigan
Mon Mar 16 2020, 13:14
Not be long, by the time they open that road it will not be long off Christmas 

- Sir Bob
- Posts : 8595
Join date : 2013-12-07
Re: A49 Link Road Wigan
Mon Mar 30 2020, 18:39
Brilliant videos Tom
On your Saturday video, you showed the acoustic fencing in place in Worlsey Mesnes, and I noticed that it was held in place by thick steel girders, and earlier in the project I explained that those girders were actually part of a safety barrier system, and each girder must be thirty feet long, with each girder having it's own hole drilled by a drilling machine, which means that about 20ft of each girder is actually concreted into the ground, to anchor them in place, in order to stop a vehicle such has a wagon careering off the new road on that first corner, and crashing through that fencing and into the houses there.

On your Saturday video, you showed the acoustic fencing in place in Worlsey Mesnes, and I noticed that it was held in place by thick steel girders, and earlier in the project I explained that those girders were actually part of a safety barrier system, and each girder must be thirty feet long, with each girder having it's own hole drilled by a drilling machine, which means that about 20ft of each girder is actually concreted into the ground, to anchor them in place, in order to stop a vehicle such has a wagon careering off the new road on that first corner, and crashing through that fencing and into the houses there.
- Corky Ringspot
- Posts : 55226
Join date : 2013-12-04
Location : Up a nick in Russia
Re: A49 Link Road Wigan
Mon Mar 30 2020, 19:09
Nice updates, Mester Tom.

- Mac
- Posts : 5904
Join date : 2016-09-07
Re: A49 Link Road Wigan
Mon Mar 30 2020, 19:15
Yes, cheeers for that, 

_________________
It's very brave and very sexy of me to continue living.
We lead, others follow.
- broady
- Posts : 2043
Join date : 2014-01-24
Age : 71
Location : Calgary, Alberta, Canada
Re: A49 Link Road Wigan
Wed Apr 01 2020, 04:36
Tomplum,
Diggers are either Aussies or Tonka toys. Those are excavators. Those dump trucks are new borns of the Dump Truck world, little babies. Google Cat 789’s when you get a minute. Keep up the good video’s.
Diggers are either Aussies or Tonka toys. Those are excavators. Those dump trucks are new borns of the Dump Truck world, little babies. Google Cat 789’s when you get a minute. Keep up the good video’s.
- mortarmillbill
- Posts : 208
Join date : 2015-03-17
Re: A49 Link Road Wigan
Wed Apr 29 2020, 16:31
Is the tarmac work nearly done? The weather has been perfect for the last six weeks.
Re: A49 Link Road Wigan
Wed Apr 29 2020, 16:35
most of it is now bill, I took some pics last week, stand by for a update,
Re: A49 Link Road Wigan
Wed Apr 29 2020, 18:59
cornt find those pics so, I shot off and geet some new un's.
- Sir Bob
- Posts : 8595
Join date : 2013-12-07
Re: A49 Link Road Wigan
Thu Apr 30 2020, 08:40
Brilliant ....
Yesterday, they were on the Poolstock Lane Bridge putting up lamposts
Yesterday, they were on the Poolstock Lane Bridge putting up lamposts

Re: A49 Link Road Wigan
Sat May 02 2020, 22:43
the foot path/cycle way, I've been looking at it and concluded that, you can get on at Goose Green and walk/cycle to Wigan but, when yooo reach the canal, you have to go to lock 2 to cross the canal then double back to the 'on ramp'' back up to the new road, I cannot see the point in that as, its easier, shorter and environmentally better to keep on the canal and walk cycle into wigan that way, Extending that pathway has no benefits only to the road builders,

- mortarmillbill
- Posts : 208
Join date : 2015-03-17
Re: A49 Link Road Wigan
Mon May 18 2020, 14:24
Fencing and landscaping work in progress near the Poolstock canal bridge this morning. It looks like the tarmac works and street lighting may now be done.
Does anyone have an opening date yet?
Does anyone have an opening date yet?
Re: A49 Link Road Wigan
Mon May 18 2020, 14:32
I was talking to Cadfiel, he works on the security and he told me 6 to seven weeks to the road being ready to drive on, that was 3 weeks ago so, that means 3 to 4 weeks for completion and then there'll be other works like, commissioning the traffic lights and alterations, It will in service before the country is back to normal for sure,

- Sir Bob
- Posts : 8595
Join date : 2013-12-07
Re: A49 Link Road Wigan
Fri May 29 2020, 14:18
@tomplum wrote:I was talking to Cadfiel, he works on the security and he told me 6 to seven weeks to the road being ready to drive on, that was 3 weeks ago so, that means 3 to 4 weeks for completion and then there'll be other works like, commissioning the traffic lights and alterations, It will in service before the country is back to normal for sure,![]()
Poppycock !!!!

- Sir Bob
- Posts : 8595
Join date : 2013-12-07
Re: A49 Link Road Wigan
Fri May 29 2020, 14:23
Yesterday I noticed that the footpath they are building from Goose Green to Poolstock, via Worsley Mesnes at the side of the road is being landscaped with trees and it has its own street lamps on it 

- tonker
- Posts : 8076
Join date : 2013-12-05
Location : Metropolitan Borough of Haydock
Re: A49 Link Road Wigan
Fri May 29 2020, 14:26
@tomplum wrote: .... 6 to seven weeks to the road being ready to drive on, that was 3 weeks ago so, that means 3 to 4 weeks for completion and then there'll be other works like, commissioning the traffic lights and alterations, ....
Plus three months snaggin'

- mortarmillbill
- Posts : 208
Join date : 2015-03-17
Re: A49 Link Road Wigan
Fri May 29 2020, 17:19
Late summer opening according to Wigan Today
- mortarmillbill
- Posts : 208
Join date : 2015-03-17
Re: A49 Link Road Wigan
Mon Jun 08 2020, 12:32
Tarmac wagons were queuing on the canal bridge near Scotsmans Flash this morning.